GHG and carbon emissions reporting in the UAE: how to get it done
By Daniel Mosse, Carbon accountantLast updated
The short answer: Most UAE companies now need to measure and report their Scope 1 and 2 greenhouse gas emissions under Federal Decree-Law No. 11 of 2024, with the compliance window running to 30 May 2027. You can do the work in-house, with software, or with a specialist adviser. This page explains what the work involves, the data you'll need, how long it takes and how to choose help.
Mizan Carbon is a specialist research platform on UAE climate regulation and emissions reporting. If you'd like help, request a consultation and we'll arrange a call with a qualified carbon accountant or ESG adviser.
GHG reporting, carbon reporting, emissions reporting: is there a difference?
Not in practice. All three describe the same job: counting the greenhouse gases your business releases, converting them into tonnes of CO2-equivalent and reporting the total.
- "GHG reporting" is the regulators' term. The UAE Climate Law covers all greenhouse gases, not just carbon dioxide.
- "Carbon reporting" is everyday shorthand for the same thing.
- "ESG reporting" is broader. Emissions are one part of it, alongside social and governance topics.
What the work involves
Whoever does it, in-house or an adviser, a compliant first year has six parts.
| Step | What happens | What you should end up with |
|---|---|---|
| 1. Applicability check | Confirm which rules apply: the federal law, Abu Dhabi's MRV programme, the national carbon register, and what customers and lenders ask for | A short written view of your obligations |
| 2. Boundary and baseline | Map every site, vehicle, generator and cooling system you control; build a first Scope 1 and 2 inventory under the GHG Protocol or ISO 14064-1 | A documented inventory and method note |
| 3. Monthly data collection | Gather electricity, cooling, fuel, fleet and refrigerant data each month and check it for gaps | A complete, checked data set |
| 4. Verifier-ready evidence | Link every number to its source document | An evidence pack an auditor can follow |
| 5. Filing | Register on the national MRV system (mrv.ae), or the Abu Dhabi EAD portal where it applies, and submit in the required format | A filed report and submission record |
| 6. Reduction plan | Turn the inventory into costed measures with owners and dates | A plan that lowers emissions and running costs |
Who typically needs outside help
Companies with roughly 20 to 500 employees and no sustainability team, especially:
- Offices, retail, hospitality and F&B: electricity, district cooling, kitchen gas and refrigerants.
- Construction and contracting: site generators, plant and fleets.
- Logistics and fleets: fuel-heavy operations where customers already ask for emissions data.
- Light manufacturing: process energy, generators and cooling.
- Suppliers to large or listed companies: answering customer questionnaires and tender requirements.
- Abu Dhabi facilities in covered sectors: annual verified reporting to EAD.
The data you'll need
Most of it already sits in your inbox. Name one owner for each stream and collect it monthly.
| Emission source | Scope | What's needed | If it's missing |
|---|---|---|---|
| Grid electricity | 2 | DEWA, ADDC, SEWA or EtihadWE bills | Sub-meters where a landlord bills you |
| District cooling | 2 | Cooling provider invoices (ton-hours) | BTU meters to split shared buildings |
| Vehicles and fleet | 1 | Fuel card statements, telematics or mileage logs | Fuel cards or telematics |
| Generators | 1 | Fuel delivery notes, run-hour logs | Tank sensors or fuel flow meters |
| LPG and gas | 1 | Supplier invoices | Gas meters for kitchens or processes |
| Refrigerants | 1 | AC service logs, refrigerant purchases | An equipment register, with top-ups logged by your contractor |
How long it takes: a typical first year
- Weeks 1–2: scope. Applicability check, boundary decision and a data map with named owners.
- Weeks 2–6: backfill. Gather 12 months of bills and logs, and order meters where data is missing.
- Weeks 6–8: first calculation. A draft Scope 1 and 2 inventory, with emission factors sourced, estimates flagged, and early quick wins such as refrigerant leaks and cooling settings.
- Monthly: run. Data captured, checked and added to a dashboard.
- Month 12: close, plan and renew. Final inventory, method note and evidence pack, plus a costed reduction plan and targets.
- Months 12–14: verify and file. Independent verification where required, then submission.
With the compliance window ending on 30 May 2027, a company starting now will only just have a full year of data in time.
What it costs
Costs depend on the number of sites and emission sources, how good your records are, and whether you need independent verification. When comparing quotes, ask:
- Is the price fixed for a defined scope, and what does it include: data collection, filing, verification support, the reduction plan?
- Who collects the data each month, you or the provider?
- Is it a one-off report or an ongoing service?
- Are metering, Scope 3 or reduction projects priced separately?
Subsidies can cover part of the cost. Abu Dhabi's Project Decarb 2.0 subsidises up to 75% of emissions assessments for eligible companies.
How to choose a provider
- Independence. The firm that prepares your inventory should never verify it. Verification must come from a separate accredited body.
- Traceable numbers. Every figure should link to a bill, log or calculation you can open.
- Official format first. The work should be built for the national MRV system and, where relevant, the Abu Dhabi template, not adapted from a generic ESG report.
- UAE experience. Look for familiarity with district cooling invoices, DEWA and ADDC billing, free-zone landlord set-ups and local refrigerants.
- Who does the data work. Software leaves the collection to your team; a service provider does it for you.
- A reduction plan, not just a report. Cooling efficiency, refrigerant management and solar often save more than reporting costs.
Standards and methods
- GHG Protocol Corporate Standard and ISO 14064-1 for the inventory.
- UAE grid emission factors for each emirate's electricity, and documented factors for district cooling and fuels.
- Facility-level inventories, matching how the national MRV system collects data.
- Five-year record keeping, as Article 6 of the Climate Law requires.
- Independent verification by accredited verifiers, where required.
Frequently asked questions
Is GHG reporting mandatory in the UAE?
Yes, for most companies. Federal Decree-Law No. 11 of 2024 requires entities whose activities emit greenhouse gases to measure, report and reduce them, free zones included, once designated as reporting Sources. The compliance window runs to 30 May 2027.
What is the difference between GHG and carbon reporting?
None in practice. GHG reporting covers all greenhouse gases, converted into CO2-equivalent. Carbon reporting is the everyday name for the same thing.
Do I need a consultant, or can I use software?
Software works if someone in your team has time to collect and check the data every month. A consultant or outsourced carbon accountant does that work for you.
Can the same firm prepare and verify my report?
No. Verification must be independent, by an accredited verifier.
How much time does it take from my team?
With a provider doing the data work, usually about an hour a month to share bills, plus a kick-off and a year-end review.
Do I need to report Scope 3?
Not under the law today. Large customers may still ask for parts of it.
We are in a free zone. Does this still apply?
Yes. The law has no free zone exemption. See Who must report.