Abu Dhabi climate rules for industry and manufacturing
By Daniel Mosse, Carbon accountantLast updated
The short answer: Industrial and manufacturing facilities in Abu Dhabi face two layers of rules. The federal Climate Law covers every company: once you are designated, you must measure, report on the Ministry's forms, reduce and keep records for five years. EAD's MRV programme adds annual verified reporting for facilities in covered sectors with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year.
Which rules apply to you
| Rule | Applies? |
|---|---|
| Federal Climate Law (Decree-Law 11 of 2024) | Yes, once designated |
| Abu Dhabi MRV programme (EAD) | Yes, a covered sector: annual verified reporting at 25,000 tCO2e of Scope 1 or more; below that, at least one year of data to confirm your status |
| National carbon register | Only at 0.5 Mt CO2e a year or more (Scope 1 and 2) |
| EU CBAM | If you export cement, iron and steel, aluminium, fertilisers, electricity or hydrogen to the EU, your EU importers need verified emissions data |
How EAD reporting works
- Who: facilities in Abu Dhabi's covered sectors (industry, power and water, oil and gas, road and rail fleets) with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year. Facilities in these sectors below the threshold still submit at least one year of data to confirm their status.
- What: annual reporting with independent third-party verification, under EAD Resolution 03 of 2026.
- When: reports are due by 31 March for the previous year.
- Where: through the EAD facility MRV portal, which links to the national MRV system.
- If something is wrong: EAD issues a written notice with a deadline to put things right. Federal penalties may follow if the problem continues, repeats or isn't corrected in time.
Where your emissions come from
- Scope 1: fuel burned in boilers, furnaces, kilns and other process equipment; process emissions; generators; refrigerant in cold stores and chillers; forklifts and company vehicles.
- Scope 2: grid electricity for production, compressed air and lighting, and chilled water from district cooling where you buy it.
- Data you'll need: fuel invoices and meter readings per facility, electricity bills or sub-meter data, production records, refrigerant service logs and fuel cards.
Common pitfalls for Abu Dhabi manufacturers
- Assuming you are below the threshold. Facilities in covered sectors still submit at least one year of data to confirm their status, so measure before you decide.
- Leaving verification late. Reports are due by 31 March, and an independent verifier needs time to check your evidence, so book one early.
- Process emissions. Some processes release greenhouse gases from chemical reactions, not only from burning fuel. Check whether yours do and measure them separately.
Outside Abu Dhabi: the federal rules apply on their own. See industry and manufacturing across the UAE.
Frequently asked questions
What is the threshold for Abu Dhabi's MRV programme?
25,000 tonnes CO2e of Scope 1 emissions in the prior year, for facilities in covered sectors. Facilities below it still submit at least one year of data to confirm their status.
When is the EAD report due?
By 31 March each year, for the previous year, with independent third-party verification.
Does the federal deadline extension change Abu Dhabi's dates?
No. The federal extension to 30 May 2027 doesn't change EAD's MRV programme, which runs on its own annual cycle.
Rules checked . See the deadline tracker for the latest status.