Skip to content

Abu Dhabi climate rules for logistics and fleets

By Daniel Mosse, Carbon accountantLast updated

The short answer: Road and rail fleet operators in Abu Dhabi face two layers of rules. The federal Climate Law covers every company: once you are designated, you must measure, report on the Ministry's forms, reduce and keep records for five years. EAD's MRV programme adds annual verified reporting for operations in covered sectors with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year.

Which rules apply to you

RuleApplies?
Federal Climate Law (Decree-Law 11 of 2024)Yes, once designated
Abu Dhabi MRV programme (EAD)Yes, a covered sector: annual verified reporting at 25,000 tCO2e of Scope 1 or more; below that, at least one year of data to confirm your status
National carbon registerOnly at 0.5 Mt CO2e a year or more (Scope 1 and 2)
Customer and tender requestsCommon: customers already ask logistics providers for emissions data

How EAD reporting works

  • Who: facilities in Abu Dhabi's covered sectors (industry, power and water, oil and gas, road and rail fleets) with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year. Facilities in these sectors below the threshold still submit at least one year of data to confirm their status.
  • What: annual reporting with independent third-party verification, under EAD Resolution 03 of 2026.
  • When: reports are due by 31 March for the previous year.
  • Where: through the EAD facility MRV portal, which links to the national MRV system.
  • If something is wrong: EAD issues a written notice with a deadline to put things right. Federal penalties may follow if the problem continues, repeats or isn't corrected in time.

Where your emissions come from

  • Scope 1: diesel and petrol for trucks, vans and locomotives; refrigerant leaks from refrigerated trucks and cold stores; forklifts and yard equipment.
  • Scope 2: electricity and district cooling for depots, warehouses, cold stores and offices.
  • Data you'll need: fuel card statements, telematics or mileage logs, refrigerant top-up records for refrigerated units and cold stores, and depot utility bills.

Common pitfalls for Abu Dhabi fleet operators

  • Assuming you are below the threshold. Facilities in covered sectors still submit at least one year of data to confirm their status, so measure before you decide.
  • Leaving verification late. Reports are due by 31 March, and an independent verifier needs time to check your evidence, so book one early.
  • Fuel bought without a fuel card. Use fuel cards or telematics so every litre is recorded.

Outside Abu Dhabi: the federal rules apply on their own. See logistics and fleets across the UAE.

Frequently asked questions

What is the threshold for Abu Dhabi's MRV programme?

25,000 tonnes CO2e of Scope 1 emissions in the prior year, for facilities in covered sectors. Facilities below it still submit at least one year of data to confirm their status.

When is the EAD report due?

By 31 March each year, for the previous year, with independent third-party verification.

Does the federal deadline extension change Abu Dhabi's dates?

No. The federal extension to 30 May 2027 doesn't change EAD's MRV programme, which runs on its own annual cycle.

Rules checked . See the deadline tracker for the latest status.