Abu Dhabi climate rules for power, water and desalination
By Daniel Mosse, Carbon accountantLast updated
The short answer: Power, water and desalination facilities in Abu Dhabi face two layers of rules. The federal Climate Law covers every company: once you are designated, you must measure, report on the Ministry's forms, reduce and keep records for five years. EAD's MRV programme adds annual verified reporting for facilities in covered sectors with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year.
Which rules apply to you
| Rule | Applies? |
|---|---|
| Federal Climate Law (Decree-Law 11 of 2024) | Yes, once designated |
| Abu Dhabi MRV programme (EAD) | Yes, a covered sector: annual verified reporting at 25,000 tCO2e of Scope 1 or more; below that, at least one year of data to confirm your status |
| National carbon register | Yes, if you emit 0.5 Mt CO2e a year or more (Scope 1 and 2) |
| EU CBAM | Only if you export electricity or hydrogen to the EU |
How EAD reporting works
- Who: facilities in Abu Dhabi's covered sectors (industry, power and water, oil and gas, road and rail fleets) with Scope 1 emissions of 25,000 tonnes CO2e or more in the prior year. Facilities in these sectors below the threshold still submit at least one year of data to confirm their status.
- What: annual reporting with independent third-party verification, under EAD Resolution 03 of 2026.
- When: reports are due by 31 March for the previous year.
- Where: through the EAD facility MRV portal, which links to the national MRV system.
- If something is wrong: EAD issues a written notice with a deadline to put things right. Federal penalties may follow if the problem continues, repeats or isn't corrected in time.
Where your emissions come from
- Scope 1: fuel burned in turbines, boilers and engines; process emissions; SF6 leaks from switchgear; backup generators and site vehicles.
- Scope 2: auxiliary power bought from the grid, and electricity or cooling bought for offices and other sites.
- Data you'll need: fuel and gas meter readings per unit, SF6 equipment inventories and top-up records, auxiliary power readings, and maintenance logs.
Common pitfalls for Abu Dhabi power and water operators
- Assuming you are below the threshold. Facilities in covered sectors still submit at least one year of data to confirm their status, so measure before you decide.
- Leaving verification late. Reports are due by 31 March, and an independent verifier needs time to check your evidence, so book one early.
- SF6 in switchgear. Small leaks of this gas weigh heavily in an inventory, so keep a register of equipment and log every top-up.
Outside Abu Dhabi: the federal rules apply on their own. See power, water and desalination across the UAE.
Frequently asked questions
What is the threshold for Abu Dhabi's MRV programme?
25,000 tonnes CO2e of Scope 1 emissions in the prior year, for facilities in covered sectors. Facilities below it still submit at least one year of data to confirm their status.
Does the national carbon register apply to us as well?
If you emit 0.5 million tonnes CO2e or more a year across Scope 1 and 2, yes. Registration was due by 28 June 2025, with stricter inventory and assurance rules.
Does the federal deadline extension change Abu Dhabi's dates?
No. The federal extension to 30 May 2027 doesn't change EAD's MRV programme, which runs on its own annual cycle.